Angelina Junior College, 1983 -1984 PROFESSIONAL AFFILIATIONS: Texas Society of Professional Surveyors. Central East Texas Chapter EXPERIENCE: Scott Morris, RPLS (TX Reg. No. 5076, TxDOT Seq. No. 10447) Project Manager has 17 years experience providing surveying services. He manages the Nacogdoches office including CADD Department and fully equipped survey field crew. Typical projects are boundary surveys, topographic surveys, subdivisions, as-built surveys, design surveys, horizontal & vertical control, and right-of-way mapping. He is responsible for field crews supervision, business development, and responsible for North and East Texas projects. PROJECT EXPERIENCE:
Subconsultant under TxDOT Bryan District Contract No. 17-145P5002 to provide field topographic surveying services in support of PS&E and obtain field surveying information for On-System Bridge Replacement on US 77 @ Big Elm Creek in Milam County. Completed: 3/31/03 - Fee: $46,759.00 - Ref: Jesse Cooper - Tel: (Austin Right of Way Division) 512-416-2874 - Fax: 5412-416-2904
Sub to TxDOT Tyler District Contract No. 10-245P5001 for State Highway 155 in Anderson County. PS&E required for the widening and reconstruction of 9 miles of SH 155 from FM 19 in Henderson County, SE to 0.5 miles northwest of FM 2267 in Anderson County, resulting in a four lane divided, depressed median, rural roadway. Completion Date: 1/31/05 - Fee: $138,069.25 - Field surveying, X-section of intersecting streets, streams and channels, locate wetlands inside ROW, obtain right-of-entry for X-sections for streams, and collect field data to complete right-of-way mapping. SH 149 (14 miles) from
0.2 mile south of FM 959 North to US 79 northwest of Carthage and from
Loop 149 and SH 155 (2.5 miles) from SH 155 south of US 80 to SH 155 north
of Big Sandy Creek. in Carthage to the Panola/Rusk County Line in Tatum,
Texas. Horizontal and vertical control for photogrammetry project. GPS.
Secure right-of-entry with landowners, lay out and maintain panels for
photogrammetry flight, and remove panels after flight. Prepare data sheets
and control book. - Fee: $99,138.80 - Completion Date: 9/30/02 - Sub to
TxDOT Atlanta District Contract No. 19-145P5005 - Ref: Robert Bailey,
P.E. - Tel: 903-796-2851 - Fax: 903-799-1229 SH 94 at the Neches River Floodplain. Design and right of way surveying for the replacement of the main bridge and four relief bridges on SH 94 in Angelina and Trinity Counties. In support of alternatives analysis, environmental assessment, bridge design, geotechnical testing, and PS&E development. Mr. Morris is responsible for the wetland ties of the project. Fee: $130,955.00 -Sub to Lufkin District Contract No. 11-845P5005 -Ref: Bill Holcomb -Tel: 409-633-4426. US 175 Widening and Reconstruction
of Bridges (15 miles) from SH 198 in Kaufman County to the FM 317
(Athens Loop) north of Athens, Texas. Right of way mapping, legal descriptions,
parcel plats, bridge design, field surveying and photogrammetry, topographic
survey details of bridges at 6 various creeks. Fee: $490,693.00 - Completion
Date: 12/4/2002 - Sub to TxDOT Tyler District Contract No. 10-945P5004
- Ref: Randy Davis - Tel: 903-510-9100 - Fax: 903-510-9127 REPLACEMENT OF BRIDGES ON SH7 at Flat Fork Creek, the Angelina River, Loco Bayou, Loco Bayou Relief and Huana Creek in Nacogdoches and Shelby Counties. Tasks associated with this work include alternatives analysis, environmental assessment (categorical exclusion), bridge design, geotechnical testing, surveying, right of way mapping and PS&E development. Fee: $128,304.00 - Completion Date: March 31, 2001- Sub to TxDOT Lufkin District Contract No. 11-945P5002 - Ref: Bill Holcomb, RPLS - Phone: 409-633-4426 - Fax: 409-633-4374 - Email: wholcom@dot.state.tx.us Loop 49/FM 2493 from SH 155 in Noonday to US 69 south of Tyler; and FM 2493 from .1 mi south of Grande Blvd. In Tyler to .1 mi south of FM 2813 in Gresham. L.P. 49 shall result in a new location four-lane divided rural parkway. FM 2493 is an existing two-lane rural roadway to be widened to a four-lane divided urban roadway with a continuous left turn lane. Field surveying. Fee: $141,927.00 - Completion Date: 8/14/2003 - Ref: Sub to TxDOT Tyler District Contract No. 10-045P5005 - Mary M. Owen, P.E. - Tel: 903-510-9100 - Fax: 903-510-9127. |
|||||||||||||||